Brenton Operations Center and Data

Brenton Operations Center and Data

A new 3 story 90,000 SF office building for Brenton Bank Headquarters. (now owned by Wells Fargo Home Mortgage). Upper level executive offices and board room. Two story atrium space from 2nd to 3rd floor, open office areas, lower level cafeteria, mechanical space, hardened data center with 4,500 SF of 36” raised floor. Outdoor dining and patio area.

Completion Date: 2001

Project Size: 90,000 SF (30,000 SF per level)

Cost: $10.68M

Project Team: 

Tim Olson, AIA, NCARB, LEED® AP: Project Manager / Project Architect with SVPA

Charles Saul Engineering

The Weitz Company – Negotiated GC

Baker Group Design / Build

Baker Electric Design / Build

Project Photo Gallery

See all Data Center Projects

Data Center and ITS Relocation

Data Center and ITS Relocation

Central College had outgrown its data center and needed more space for its IT Staff.   Tim Olson was hired to provide a design solution that would repurpose a space previously used as a physical plant and maintenance shop.  The design solution provided office space for 14 IT staff and a 540 SF raised floor space for data racks with overhead bus and underfloor cooling.

Completion Date: 2009

Cost: $1.5M

Project Team:

Tim Olson, AIA, NCARB, LEED AP: Principal-in-Charge / Project Manager / Project Architect with SVPA

MEP Associates

The Weitz Company with the Owner.

Project Photo Gallery

See all Data Center Projects

Principal Data Center Expansion

Principal Data Center Expansion

Principal Financial Group needed a 9,750 SF addition Live Upgrade to an existing Data Center done in three phases.  (1) Electrical Room: provided redundancy with all Electrical Systems, (2) Loading Dock Expansion: Provided clean room and new loading dock with more efficient dock equipment, and (3) Security Addition / new entry.

Completion Date:  June 2012

Project Size:   9,750 SF

Cost:  $12.8M

Project Team:

Tim Olson, AIA, NCARB, LEED AP: Project Manager / Project Architect with RDG

Ryan Companies

Baker Group

Baker Electric

Charles Saul Engineering

Bishop Engineering

Project Photo Gallery

See all Data Center Projects

University of Iowa Information Technology Center and HCIS

University of Iowa Information Technology Center and HCIS

A new 43,500 SF Data Center. 17,000 SF of raised floor, Command Center, War Room, Offices, Electrical and Mechanical Support Space, Loading Dock, Burn-in Rooms, Office Space, and Vendor Hotel Space.  The project requirements included meeting “Tier 3” requirements, and to withstand an EF3 Tornado, while still meeting LEED Platinum Sustainability Requirements. The main building materials used for exterior construction are precast concrete, high efficiency mechanical, electrical and plumbing systems.  This building was designed with NO roof penetrations for mechanical or plumbing systems, to avoid any potential roof leaks.  A redundant roof system was designed with a leak detection grid tied into the Building Automation System.  LEED Certified:  LEED Platinum in 2012.  Sustainable Design Features: Precast concrete exterior wall panels, High efficiency MEP systems, Regional and high-recycled content materials, Enhanced building commissioning, Construction waste salvage and recycling, Pavement / hardscape materials with high Solar Reflectance.

Completion Date: 2012

Project Size: 45,324 SF

Project Cost: $30,000,000

Type of Delivery: Construction Management

Project Team:

Tim Olson, AIA, NCARB, LEED AP: Project Architect / Project Manager with SVPA

HP / EYP Mission Critical Facilities

Ryan Companies

Cardinal Construction

Project Photo Gallery

See all Data Center Projects